800 - 231 - 3345   or   713 - 263 - 8001

Firestopping - System Drawings

Select an item from the lists of available System Drawings below:
Complete System Drawing Index

Insulated Pipes

Concrete and Block Walls

  System #   Description F Rating Product
CAJ5073-W - Max. 10 in. metallic pipe with max. 1 in. AB/PVC foam insul. w/ max. 15 in. diameter opening 1-1/2 hr. FS 1900
CAJ5116-W - Max. 12 in. metallic pipe with max. 1 in. fiberglass insul. w/ max. 18 in. diameter opening 2 hr. FS 1900
CAJ5117-W - Max. 6 in. metallic pipe with max. 1 in. AB/PVC foam insul. w/ max. 10 in. diameter opening 3 hr. FSWS 150 / FS 1900
CAJ5118-W - Max. 8 in. metallic pipe with max. 2 in. fiberglass insul. w/ max. 14 in. diameter opening 3 hr. FSWS 150 / FS 1900
CAJ5175-W - Max. 10 in. metallic pipe with max. 1 in. foamglas insul. w/ max. 18 in. diameter opening 3 hr. FS 900+
CAJ5208-W - Max. 4 in. metallic pipe with max. 1 in. AB/PVC foam insul. w/ max. 8 in. diameter opening (2-1/2 in. slab) 2 hr. FS 1900
CAJ5222-W - Max. 24 in. steel/iron or 6 in. copper pipe with max. 2 in. fiberglass insulation w/ max. 29-1/2 in. dia. opening (Optional Pre-cast Hollow Core Concrete Units and Steel Sleeve). 2 hr. FS 1900 or FS 900+
CAJ5223-W - Max. 8 in. steel or iron pipe with max. 3 in. foamglas insul. w/ max. 18 in. diameter opening 2 hr. FS 900+
CAJ5238-W - Up to 6, max. 3 in. metallic pipes with max. 3/4 in. AB/PVC foam insul. w/ max. 24 x 6 in. opening 3 hr. FS 1900
CAJ5243-W - Max. 10 in. steel pipe with a max. 2 in. fiberglass insulation w/ max. 16 in. dia. opening 2 hr. FlameSafe Silicone
CAJ5249-W - Max. 4 in. steel, iron or copper with max. 1 in. fiberglass insulation w/ max. 7 in. dia. opening (Optional Pre-cast Hollow Core Concrete Units). Bottom only install. 1-1/2 hr. FS 1900
CAJ5250-W - Max. 4 in. steel, iron or copper with max. 1 in. fiberglass insulation w/ max. 8-1/2 in. dia. opening in a min. 2-1/2 thick floor or wall assembly (Optional Steel Sleeve). 1 hr. FS 1900
CAJ5251-W - Max. 4 in. steel, iron or copper with max. 2 in. fiberglass insulation w/ max. 10-5/8 in. dia. opening in a min. 2-1/2 thick floor or wall assembly (Optional Steel Sleeve). 1 hr. FS 1900
CAJ5283-W - Max. 24 in. steel/iron or 6 in. copper with max. 2 in. fiber- glass insulation w/max. 29-1/2 in. dia. opening (Optional Hollow Core Floor & Steel Sleeve). 3 hr. FS 1900 or FS 900+
CAJ5308-W - Max. 16 in. steel pipe with max. 3 in. foamglass insulation and aluminum jacket 2 hr. FS 4000
CAJ5309-W - Max. 16 in. steel pipe with max. 3 in. foamglass insulation and aluminum jacket 2 hr. FS 4000
CBJ5008-W - Max. 8 in. metallic pipe with max. 2 in. fiberglass insul. w/ max. 16 in. diameter opening 3 hr. FS 1900
WJ5035 - Max. 8 in. steel pipe with max. 1-1/2 in. calcium silicate insul. w/ max. 13 in. opening 2 hr. FS 1900
WJ5036 - Max. 10 in. steel, iron or 6 in. copper pipe with max. 3 in. cellular glass insulation (Foamglas) w/ max. 18 in. diameter opening 2 hr. FS 1900
WJ5043 - Max. 12 in. metallic pipe with 3 in. fiberglass insul. w/ max. 20 in. diameter opening 2 hr. FSWS 100 / FS 1900
WJ5079 - Max. 12 in. steel or iron, max. 6 in. copper w/2 in. fiberglass insul. w/max. 18-5/16 in. diam. opening. 2 hr. FS 1900 or FS 900+
WJ5080 - Max. 12 in. metallic pipe with 2 in. fiberglass insul. through optional max. 18-3/4 in. sleeve 2 hr. FS 900+
WJ5081 - Max. 12 in. steel or iron, max. 6 in. copper w/3/4 in. AB/PVC insul. w/max. 15-1/4 in. diam. opening. 2 hr. FS 1900 or FS 900+
WJ5093 - Max. 6 in. metallic pipe with 3 in. fiberglass insul. through max. 14 in. dia. sleeve 1-1/2 hr. FS 1900

Concrete Floors

  System #   Description F Rating Product
CAJ5073-F - Max. 10 in. metallic pipe with max. 1 in. AB/PVC foam insul. w/ max. 15 in. diameter opening 1-1/2 hr. FS 1900
CAJ5116-F - Max. 12 in. metallic pipe with max. 1 in. fiberglass insul. w/ max. 18 in. diameter opening 2 hr. FS 1900
CAJ5117-F - Max. 6 in. metallic pipe with max. 1 in. AB/PVC foam insul. w/ max. 10 in. diameter opening 3 hr. FSWS 150 / FS 1900
CAJ5118-F - Max. 8 in. metallic pipe with max. 2 in. fiberglass insul. w/ max. 14 in. diameter opening 3 hr. FSWS 150 / FS 1900
CAJ5175-F - Max. 10 in. metallic pipe with max. 1 in. foamglas insul. w/ max. 18 in. diameter opening 3 hr. FS 900+
CAJ5208-F - Max. 4 in. metallic pipe with max. 1 in. AB/PVC foam insul. w/ max. 8 in. diameter opening (2-1/2 in. slab) 2 hr. FS 1900
CAJ5222-F - Max. 24 in. steel/iron or 6 in. copper pipe with max. 2 in. fiberglass insulation w/ max. 29-1/2 in. dia. opening (Optional Pre-cast Hollow Core Concrete Units and Steel Sleeve). 2 hr. FS 1900 or FS 900+
CAJ5223-F - Max. 8 in. steel or iron pipe with max. 3 in. foamglas insul. w/ max. 18 in. diameter opening 2 hr. FS 900+
CAJ5238-F - Up to 6, max. 3 in. metallic pipes with max. 3/4 in. AB/PVC foam insul. w/ max. 24 x 6 in. opening 3 hr. FS 1900
CAJ5243-F - Max. 10 in. steel pipe with a max. 2 in. fiberglass insulation w/ max. 16 in. dia. opening 2 hr. FlameSafe Silicone
CAJ5249-F - Max. 4 in. steel, iron or copper with max. 1 in. fiberglass insulation w/ max. 7 in. dia. opening (Optional Pre-cast Hollow Core Concrete Units). Bottom only install. 1-1/2 hr. FS 1900
CAJ5250-F - Max. 4 in. steel, iron or copper with max. 1 in. fiberglass insulation w/ max. 8-1/2 in. dia. opening in a min. 2-1/2 thick floor or wall assembly (Optional Steel Sleeve). 1 hr. FS 1900
CAJ5251-F - Max. 4 in. steel, iron or copper with max. 2 in. fiberglass insulation w/ max. 10-5/8 in. dia. opening in a min. 2-1/2 thick floor or wall assembly (Optional Steel Sleeve). 1 hr. FS 1900
CAJ5283-F - Max. 24 in. steel/iron or 6 in. copper with max. 2 in. fiber- glass insulation w/max. 29-1/2 in. dia. opening (Optional Hollow Core Floor & Steel Sleeve). 3 hr. FS 1900 or FS 900+
CAJ5308-F - Max. 16 in. steel pipe with max. 3 in. foamglass insulation and aluminum jacket 2 hr. FS 4000
CAJ5309-F - Max. 16 in. steel pipe with max. 3 in. foamglass insulation and aluminum jacket 2 hr. FS 4000
CBJ5008-F - Max. 8 in. metallic pipe with max. 2 in. fiberglass insul. w/ max. 16 in. diameter opening 3 hr. FS 1900

Wood Framed Chase Walls and Floors

  System #   Description F Rating Product
FC5010 - Max. 1-1/2 in. metallic pipe with 1 in. fiberglass insul. w/ max. 4-3/4 in. diameter opening 2 hr. FS 1900
FC5011 - Max. 1-1/2 in. metallic pipe with 1 in. FG or 3/4 in. AB/PVC w/ max. 4-3/4 in. diameter opening 1 hr. FS 1900
FC5025 - Max. 2 in. metallic pipe with 1/2 in. AB/PVC foam insul. w/ max. 3-3/4 in. diameter opening 1 & 2 hr. FSWS 100 / FS 1900

Steel Framed Concrete Floors

  System #   Description F Rating Product
FE5003 - Max. 1-1/2 in. metallic pipe with 1 in. FG or 3/4 in. AB/PVC w/ max. 4-3/4 in. diameter opening 1 hr. FS 1900

Gypsum Walls

  System #   Description F Rating Product
WL5086 - Max. 8 in. steel pipe with max. 1-1/2 in. calcium silicate insul. w/ max. 13 in. opening 1 & 2 hr. FS 1900
WL5087 - Max. 10 in. steel, iron or 6 in. copper pipe with max. 3 in. cellular glass insulation (Foamglas) w/ max. 18 in. diameter opening 1 & 2 hr. FS 1900 or FS 900+
WL5097 - Max. 12 in. metallic pipe with 3 in. fiberglass insul. w/ max. 20 in. diameter opening 1 & 2 hr. FSWS 100 / FS 1900
WL5171 - Max. 12 in. steel or iron, max. 6 in. copper w/2 in. fiberglass insul. w/max. 18-5/16 in. diam. opening. 1 & 2 hr. FS 1900 or FS 900+
WL5172 - Max. 12 in. metallic pipe with 2 in. fiberglass insul. through max. 18-3/4 in. dia. sleeve 1 & 2 hr. FS 900+
WL5173 - Max. 12 in. steel or iron, max. 6 in. copper w/ 3/4 in. AB/PVC insul. w/max. 15-1/4 in. diam. opening. 1 & 2 hr. FS 1900 or FS 900+

WL5193

- Max. 6 in. metallic pipe with 3 in. fiberglass insul. through max. 14 in. dia. sleeve 1 & 2 hr. FS 1900